Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

← All guides

Migration

WordPress migration steps for a controlled host move

Published August 2026 · 9 min read

A WordPress migration is safest when the new site is working before public DNS changes. That turns cutover into a traffic switch after the copied site has already been proven.

Inventory the source

Record WordPress and PHP versions, database size, uploads, active theme and plugins, scheduled jobs, mail setup, DNS records, redirects, caching, CDN configuration, SSL, and any server-specific rules.

Build and test the destination privately

Copy files and the database, adjust environment-specific configuration, and test through a temporary hostname or local hosts-file mapping. Verify administrator login, forms, media, links, and integrations.

Plan the final data sync

For a changing site, decide how orders, form entries, comments, accounts, or other writes will be handled between the first copy and cutover. A content freeze or final database sync may be necessary.

Cut DNS only after the new copy is ready

Lower TTL ahead of the move when appropriate, switch the required records, monitor both old and new environments during cache expiry, and keep the source available until traffic and data have been verified.

Next step

Move WordPress with an inventory, destination build, file and database copy, test URL, final sync, DNS cutover, verification, and rollback plan.

Plan a WordPress migration

Keep reading

Related guides.

Change email hosting without downtime: migrate mail without losing messages

Change email hosting without downtime by preparing destination mailboxes first, copying historical mail, preserving aliases and authentication, switching MX carefully, and synchronizing messages delivered during the transition.

Read the guide

How to move web hosting without downtime

Move a website and database with destination testing, final synchronization, controlled DNS cutover, and rollback while preserving separate mail routing.

Read the guide

Moving a DreamHost VPS to Canadian hosting

Inventory the server, copy it safely, test it, and cut DNS over with a rollback plan.

Read the guide

More migrations guides

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move