Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

Migration

How to move web hosting without downtime

You can move a website to a new host with no downtime at all. The sequence is what makes it safe: build and test the new copy while your current site keeps running, shorten the wait time on your address records ahead of the switch, change only the records the website needs, and keep the old site available until the new one is proven. Your visitors never see a broken site, and if anything is not right, the old site is still there to switch back to.

1. Copy before changing DNS

Build the new hosting account first. Copy website files, databases, cron jobs, redirects, and application settings while the old host is still serving traffic.

2. Test the new copy

Test the site against the new server before changing public DNS. Check forms, logins, uploads, scheduled tasks, database writes, SSL, and any application-generated outbound mail.

3. Reduce DNS TTL

Lower the TTL ahead of the move when possible. TTL is the wait time attached to an address record: it tells the rest of the internet how long to remember the answer. Lowering it a day or two early means the final change is noticed within minutes.

4. Sync changing data again

Sites that receive orders, comments, uploads, or other writes need a final database and file sync immediately before cutover.

5. Change only the DNS records the website move requires

Point the website records to the new host only after the new copy is working. A website-hosting move does not require changing MX records when email is staying with the existing mail provider. Keep the old web service online while DNS caches expire.

6. Watch both web servers

Check traffic, error logs, forms, background jobs, database activity, and application-generated messages during the transition.

7. Cancel last

Do not cancel the old hosting account until the new service has been stable and you have a separate backup of the final site. Keeping the old account live is also your way back: if the new site misbehaves after the switch, the address records can point back at the old site while the problem is fixed.

What visitors notice during the move

Nothing, when the move runs in this order. For a short period some visitors reach the old copy and some reach the new one while address changes spread, which is why changing data is synced again at the switch and why the old copy stays up until every visitor is landing on the new one.

Changing the email provider too? Moving mailboxes is a separate cutover with its own steps for changing email hosting without downtime. Follow the email hosting migration guide before changing mail routing. Email that already runs on Microsoft 365 or Google Workspace does not need to move at all.

Want the move done for you? Assisted migration is free with DotMoose hosting.See how the free migration works

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move