Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

← All guides

Migrations

What to collect before moving web hosts

Published October 2026 · 8 min read

A hosting move is much easier when the source material is collected before anything changes. You do not need to understand every server setting. You do need a complete copy, a short inventory, and continued access to the old account until the new copy is proven.

Start with the website address and hosting product

Write down the public website address and the exact hosting product shown on the bill or dashboard. A company may sell cPanel hosting, managed WordPress, a website builder and VPS service under the same brand. Those products do not use the same export process.

  • Website address
  • Hosting company
  • Product or plan name
  • Control panel name, if one is shown

Collect files and databases as a matched set

Most content management systems need both website files and a database. The files contain code, themes, plugins and uploaded media. The database contains pages, posts, users, settings and often store orders.

Create the two exports close together in time and label them with the same date. Keep the original copy on your computer until the move is complete.

Record DNS and email separately

The website host, DNS provider and email provider may be three different companies. Copy the current DNS records and list every mailbox, forwarder and mailing service before cutover. Moving a website must not silently move or break email.

DNS cutover checklist | Move email without losing new mail

Use temporary access instead of sharing a permanent password

If an automated route needs panel access, create a temporary restricted credential where the old provider supports one. Easy Migration asks for private access only after sign-in and only when the chosen transfer method needs it.

Do not disable multi-factor authentication just to make a migration easier. A backup upload or assisted route is safer when temporary access is unavailable.

Keep the old service until verification is complete

A copied site is not automatically a correct site. Test important pages, forms, logins, scheduled jobs and checkout flows on the destination. Take a final sync for changing data, approve cutover, and retain the old account through the rollback window.

Common questions

Do I need to change DNS before the migration?

No. Copy and test the site first. DNS changes belong near the end, after the destination is ready and you have approved the cutover plan.

What if I cannot find my current host?

Start with the website address. Public DNS and platform signals can often narrow the provider, but the account owner should still confirm the product before private access is requested.

Next step

A plain-language checklist for collecting website files, databases, DNS, email details and rollback evidence before changing web hosts.

Open Easy Migration preview

Keep reading

Related guides.

Change email hosting without downtime: migrate mail without losing messages

Change email hosting without downtime by preparing destination mailboxes first, copying historical mail, preserving aliases and authentication, switching MX carefully, and synchronizing messages delivered during the transition.

Read the guide

HSTS: the header that makes browsers insist on HTTPS

What the Strict-Transport-Security header does, what max-age and includeSubDomains mean in plain words, and how to check your own site. On DotMoose it is on by default for every Shared and WordPress site.

Read the guide

What a hosting customer actually pays for

Where a hosting payment actually goes: the server, the room it sits in, bandwidth, licences, backups, support time, payment fees, and the renewal cliff that funds low intro prices.

Read the guide

All guides

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move