Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

← All guides

Migration

DNS cutover checklist for moving a live service

Published August 2026 · 8 min read

DNS cutover should be one of the last steps in a migration, not the moment the destination is first tested. Prepare the new service until it can handle production, then use DNS to direct users to something that is already working.

Lower the relevant TTL ahead of time

Reduce TTL early enough for resolvers holding the previous high value to expire before the planned change. Record the old value so it can be restored after the migration stabilizes.

Test the destination using the real hostname

Use a hosts-file override, preview feature, or controlled routing method so the destination serves the production hostname and can be tested for TLS, redirects, cookies, virtual-host routing, and application URLs.

Complete final state synchronization before changing the record

Copy data that changed after the initial migration and decide whether a short write freeze is needed. The destination should be as current as the recovery objective requires before new users are sent there.

Monitor both addresses during cache transition

Verify authoritative DNS immediately, then check recursive resolvers, logs, health checks, forms, and application writes. Keep the source available for clients with cached old answers and retain a documented rollback until the transition is complete.

Next step

A DNS cutover checklist covers TTL preparation, destination testing, final data sync, record changes, authoritative verification, cache transition, monitoring, and rollback.

Plan a controlled migration

Keep reading

Related guides.

Change email hosting without downtime: migrate mail without losing messages

Change email hosting without downtime by preparing destination mailboxes first, copying historical mail, preserving aliases and authentication, switching MX carefully, and synchronizing messages delivered during the transition.

Read the guide

How to move web hosting without downtime

Move a website and database with destination testing, final synchronization, controlled DNS cutover, and rollback while preserving separate mail routing.

Read the guide

Moving a DreamHost VPS to Canadian hosting

Inventory the server, copy it safely, test it, and cut DNS over with a rollback plan.

Read the guide

More migrations guides

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move