Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

← All guides

Migrations

Website migration for beginners: what to expect before, during, and after

Published August 2026 · 8 min read

A migration is mostly about creating a second working copy before directing visitors to it. Beginners often imagine the website physically “moves” all at once; in practice the data is copied, tested, synchronized and then traffic is redirected.

Before the move, preserve the source

Take a backup and inventory the current setup. Know the domain registrar, DNS provider, host, email provider, database and any third-party services.

During the move, build a parallel destination

Copy files and databases, configure the application and test it without changing public DNS if possible. This keeps troubleshooting away from live visitors.

At cutover, change only what is necessary

Update the relevant DNS records or nameservers and keep the old service running. Cached DNS means visitors can reach different environments during the transition.

After the move, test business functions

Verify HTTPS, forms, logins, checkout, email and scheduled jobs. Keep the old host until you are confident the new environment has everything you need.

Define a finish line before the move starts

A migration is complete only when the production domain reaches the new site, HTTPS works, forms and logins work, mail is accounted for and the old host is no longer receiving traffic you still need. Write those checks down before cutover.

Keep the source service until the validation period is over. Cancelling early removes the simplest rollback option and can also destroy files or mailboxes you did not realize were still in use.

Common questions

When can I cancel the old host after a migration?

After DNS has settled, the new site and email paths are verified, and you have confirmed no required data or services remain on the old account. Keeping a short overlap is safer than cancelling immediately.

Next step

A plain-language website migration walkthrough explaining backups, staging, DNS, nameservers, databases, email, SSL, testing, propagation, and when the old host can be cancelled.

Explore migrations

Keep reading

Related guides.

Change email hosting without downtime: migrate mail without losing messages

Change email hosting without downtime by preparing destination mailboxes first, copying historical mail, preserving aliases and authentication, switching MX carefully, and synchronizing messages delivered during the transition.

Read the guide

How to move web hosting without downtime

Move a website and database with destination testing, final synchronization, controlled DNS cutover, and rollback while preserving separate mail routing.

Read the guide

Moving a DreamHost VPS to Canadian hosting

Inventory the server, copy it safely, test it, and cut DNS over with a rollback plan.

Read the guide

More migrations guides

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move