Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

← All guides

Migrations

How to switch web hosts as a beginner without turning it into an outage

Published August 2026 · 8 min read

Switching hosts is safest when the new environment is built and tested before the old one is removed. The migration becomes a controlled cutover with time to test and roll back before the old account is removed.

Inventory before moving anything

Write down domains, website files, databases, email accounts, DNS records, cron jobs, redirects, SSL and any external integrations. Unknown dependencies are a common reason migrations go wrong.

Build the destination first

Copy the site and database to the new hosting environment and test it using a temporary hostname or local hosts-file override when possible. Fix application issues before public traffic changes.

Treat email and DNS as separate workstreams

If email remains elsewhere, preserve its records. If email moves too, plan a synchronization window so messages arriving during the cutover are not lost.

Keep rollback available

Do not immediately cancel the old host. Leave enough overlap to verify the new site, forms, email, HTTPS and important business functions from several networks.

Use a copy-test-cutover sequence

Copy the site to the destination before changing public DNS, test it on the new host, and keep the old service available during the cutover. That sequence gives you evidence that the destination works before visitors are sent there.

Record the old DNS values and lower TTL only when you understand the timing. A beginner migration is safer when every change has a documented rollback step available during an outage.

Common questions

Will changing web hosts cause downtime?

It does not have to. A well-planned migration prepares the destination before DNS changes and keeps the old environment available during the transition.

Next step

A beginner migration guide covering backups, files, databases, email, DNS, SSL, testing, TTL, cutover, rollback, and what to verify after changing web hosts.

Ask about website migration

Keep reading

Related guides.

Change email hosting without downtime: migrate mail without losing messages

Change email hosting without downtime by preparing destination mailboxes first, copying historical mail, preserving aliases and authentication, switching MX carefully, and synchronizing messages delivered during the transition.

Read the guide

How to move web hosting without downtime

Move a website and database with destination testing, final synchronization, controlled DNS cutover, and rollback while preserving separate mail routing.

Read the guide

Moving a DreamHost VPS to Canadian hosting

Inventory the server, copy it safely, test it, and cut DNS over with a rollback plan.

Read the guide

More migrations guides

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move