Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

WordPress migration Canada

WordPress migration to Canadian hosting

Move WordPress files and data with a plan for plugins, email and new orders. Test the destination before switching traffic.

Hosting options

Compare the services for your project.

Your requirements

What does your project need?

01

What needs to move

Check moving WordPress with files, database, uploads, PHP/runtime compatibility, plugins, cron, mail, TLS, cache behavior, write synchronization, DNS cutover, and a tested rollback plan.

02

Test the destination

Copy the site or application to the new host and test it privately. Check logins, forms, database writes, scheduled jobs, email and any external integrations.

03

Copy the final changes

Choose when to stop or synchronize new writes. Include orders, uploads and mail that arrived after the first copy. Avoid letting both systems accept independent changes.

04

Switch traffic and retain rollback

Save the old DNS and routing settings. Switch traffic after the final tests, monitor the result and keep the old service until the agreed rollback period has passed.

Field guide

Move WordPress in matched parts

A WordPress move carries files, the database, and the uploads folder, and the three must agree. The database stores the site address, so URLs inside it need updating to the new domain or location with a tool that handles serialized data safely. A plain text replace corrupts those values.

Match the runtime before blaming the move. Check the PHP version and extensions on the destination against what the site runs now, and confirm plugins and the theme support them. After cutover, verify cron runs, mail sends, caching behaves, and permalinks resolve before calling the move done.

01

Writes during cutover

New posts, orders, and comments land on the old site until DNS settles. Run a final database sync after propagation or accept losing them.

02

TLS after DNS

Issue the certificate once DNS points at the destination, then force HTTPS and check for mixed content warnings in the browser console.

03

Rollback ready

Keep the old hosting and the pre move database untouched for a week. A rollback is then a DNS change, not a rebuild.

Planning

Access, backups and handover

Confirm the current product specifications and service responsibilities. Record who can approve a change and how to recover the service if it goes wrong.

Free guide

WordPress migration to Canadian hosting: planning checklist

Use the detailed checklist to plan setup, access, migration and recovery with your team.

Download PDF →
Help choosing

Tell us about your project.

Send us the software you use, your storage needs and your launch or moving date.

Ask about hosting

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move