Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

Move VPS Canada

Move your VPS to Canada

Move applications and data to a Canadian Linux VPS. Review services, firewall rules, public addresses and the downtime your project can tolerate.

Hosting options

Compare the services for your project.

Your requirements

What does your project need?

01

What needs to move

Check moving a VPS into Canada by inventorying operating system services, packages, users, firewall rules, data volumes, scheduled jobs, DNS, public IP dependencies, and downtime tolerance.

02

Test the destination

Copy the site or application to the new host and test it privately. Check logins, forms, database writes, scheduled jobs, email and any external integrations.

03

Copy the final changes

Choose when to stop or synchronize new writes. Include orders, uploads and mail that arrived after the first copy. Avoid letting both systems accept independent changes.

04

Switch traffic and retain rollback

Save the old DNS and routing settings. Switch traffic after the final tests, monitor the result and keep the old service until the agreed rollback period has passed.

Field guide

Rebuilding a VPS on Canadian soil

A VPS move starts with an inventory, not a copy. Record the operating system and version, installed packages, running services, users and SSH keys, firewall rules, mounted volumes and every scheduled job. Data then moves by rsync or database dump while the old server keeps running, and the new Canadian server is built to match the inventory.

Hard coded IP addresses cause most of the damage in a server move. Scripts, allowlists, mail records and third party services often point at the old address, and reverse DNS for outgoing mail needs setting on the new one. Lower DNS TTLs ahead of time, test every service on the new address, and keep the old server answering during propagation.

01

Service inventory first

Write down packages, services, ports, users and cron jobs before copying anything. The inventory becomes the build list and the final comparison check.

02

IP address dependencies

Search configs and scripts for the old public address. Update allowlists, SPF records and reverse DNS so mail and integrations keep working after cutover.

03

Parallel run period

Run both servers until DNS propagation finishes and logs on the new server look normal. Rollback stays a DNS change, not a rebuild.

Planning

Access, backups and handover

Confirm the current product specifications and service responsibilities. Record who can approve a change and how to recover the service if it goes wrong.

Free guide

Move your VPS to Canada: planning checklist

Use the detailed checklist to plan setup, access, migration and recovery with your team.

Download PDF →
Help choosing

Tell us about your project.

Send us the software you use, your storage needs and your launch or moving date.

Ask about hosting

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move