What needs to move
Check moving a VPS into Canada by inventorying operating system services, packages, users, firewall rules, data volumes, scheduled jobs, DNS, public IP dependencies, and downtime tolerance.
Move VPS Canada
Move applications and data to a Canadian Linux VPS. Review services, firewall rules, public addresses and the downtime your project can tolerate.
Hosting options
Help moving websites, databases and email. We agree on the scope and cutover details before the move.
See Migration help →02Tell us what you need to host and when it needs to be ready.
See Ask about your project →03Register or transfer a domain and manage DNS. Registration and renewal prices depend on the extension.
See Domains →Your requirements
Check moving a VPS into Canada by inventorying operating system services, packages, users, firewall rules, data volumes, scheduled jobs, DNS, public IP dependencies, and downtime tolerance.
Copy the site or application to the new host and test it privately. Check logins, forms, database writes, scheduled jobs, email and any external integrations.
Choose when to stop or synchronize new writes. Include orders, uploads and mail that arrived after the first copy. Avoid letting both systems accept independent changes.
Save the old DNS and routing settings. Switch traffic after the final tests, monitor the result and keep the old service until the agreed rollback period has passed.
Field guide
A VPS move starts with an inventory, not a copy. Record the operating system and version, installed packages, running services, users and SSH keys, firewall rules, mounted volumes and every scheduled job. Data then moves by rsync or database dump while the old server keeps running, and the new Canadian server is built to match the inventory.
Hard coded IP addresses cause most of the damage in a server move. Scripts, allowlists, mail records and third party services often point at the old address, and reverse DNS for outgoing mail needs setting on the new one. Lower DNS TTLs ahead of time, test every service on the new address, and keep the old server answering during propagation.
Write down packages, services, ports, users and cron jobs before copying anything. The inventory becomes the build list and the final comparison check.
Search configs and scripts for the old public address. Update allowlists, SPF records and reverse DNS so mail and integrations keep working after cutover.
Run both servers until DNS propagation finishes and logs on the new server look normal. Rollback stays a DNS change, not a rebuild.
Planning
Confirm the current product specifications and service responsibilities. Record who can approve a change and how to recover the service if it goes wrong.
Use the detailed checklist to plan setup, access, migration and recovery with your team.
Download PDF →Send us the software you use, your storage needs and your launch or moving date.
Ask about hostingYour current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.