Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

Migrate from HostPapa

HostPapa alternative in Canada: move hosting to DotMoose

Compare a move from HostPapa to DotMoose by inventorying website files, databases, email, DNS, domains and any VPS or WordPress services before changing traffic.

Hosting options

Compare the services for your project.

Your requirements

What does your project need?

01

What needs to move

Check leaving HostPapa by first identifying the exact hosting, domain, DNS, email, WordPress, or VPS components in use because each component may need its own migration path.

02

Test the destination

Copy the site or application to the new host and test it privately. Check logins, forms, database writes, scheduled jobs, email and any external integrations.

03

Copy the final changes

Choose when to stop or synchronize new writes. Include orders, uploads and mail that arrived after the first copy. Avoid letting both systems accept independent changes.

04

Switch traffic and retain rollback

Save the old DNS and routing settings. Switch traffic after the final tests, monitor the result and keep the old service until the agreed rollback period has passed.

Field guide

Sorting a HostPapa account into parts

A HostPapa account can hold several separate things at once: shared hosting, domain registrations, DNS, mailboxes and sometimes a VPS. Start with an inventory of which of those are actually in use. Shared sites export through the panel as files plus database dumps, while registered domains follow the registrar transfer path on their own schedule.

The common failure is assuming one export covers everything. Mailboxes live inside the hosting account, DNS may sit with the domain registration, and a site built with a website builder tool may not export as files at all. Check each component, test the rebuilt site privately, and change DNS only after mail and forms pass on the new copy.

01

Component inventory first

List hosting, domains, DNS, mail and any VPS as separate items. Each one gets its own export method and its own completion check.

02

Builder site warning

Ask how each site was built. Drag and drop builder sites usually need a rebuild at the destination, while WordPress and static sites copy as files.

03

Mail inside hosting

Mailboxes stored in the hosting account move with the site data. Recreate each address and move its stored mail before the MX record changes.

Planning

Access, backups and handover

Confirm the current product specifications and service responsibilities. Record who can approve a change and how to recover the service if it goes wrong.

Free guide

HostPapa alternative in Canada: move hosting to DotMoose: planning checklist

Use the detailed checklist to plan setup, access, migration and recovery with your team.

Download PDF →
Help choosing

Tell us about your project.

Send us the software you use, your storage needs and your launch or moving date.

Ask about hosting

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move