Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

Migrate from Bluehost

Bluehost hosting alternative in Canada: move to DotMoose

Plan a Bluehost-to-DotMoose move around the website and database copy, mail dependencies, DNS, redirects, SSL and a tested destination before cutover.

Hosting options

Compare the services for your project.

Your requirements

What does your project need?

01

What needs to move

Check leaving Bluehost with a destination-first website migration that verifies files, databases, PHP/runtime requirements, mail dependencies, DNS, redirects, SSL, and current writes before traffic changes.

02

Test the destination

Copy the site or application to the new host and test it privately. Check logins, forms, database writes, scheduled jobs, email and any external integrations.

03

Copy the final changes

Choose when to stop or synchronize new writes. Include orders, uploads and mail that arrived after the first copy. Avoid letting both systems accept independent changes.

04

Switch traffic and retain rollback

Save the old DNS and routing settings. Switch traffic after the final tests, monitor the result and keep the old service until the agreed rollback period has passed.

Field guide

A destination first move from Bluehost

Bluehost sites are usually WordPress on a cPanel style account, so the export is familiar: site files from the file manager or FTP, the database through phpMyAdmin, and mailboxes stored inside the account. Download a full backup as well. The panel backup and the manual exports together give two ways to rebuild if one restore path fails.

PHP version drift causes the visible failures here. A site that ran on an older PHP release can break on a newer default, and caching or security plugins can block the destination test address. Match the PHP version during testing, clear plugin caches on the copy, and check logins, comments and checkout before DNS changes and again right after.

01

Runtime match check

Record the PHP version and extensions the site uses at Bluehost. Set the destination to match before judging any test result.

02

Staging address blocks

Security plugins sometimes reject logins from a temporary test address. Note which plugins do this and plan the whitelist step before testing starts.

03

Writes before cutover

Comments, orders and form entries keep arriving at the old site during the move. Sync the database once more inside the cutover window.

Planning

Access, backups and handover

Confirm the current product specifications and service responsibilities. Record who can approve a change and how to recover the service if it goes wrong.

Free guide

Bluehost hosting alternative in Canada: move to DotMoose: planning checklist

Use the detailed checklist to plan setup, access, migration and recovery with your team.

Download PDF →
Help choosing

Tell us about your project.

Send us the software you use, your storage needs and your launch or moving date.

Ask about hosting

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move