Fill the Server: 80% off your first 4 monthly invoices, monthly billing. Ends Nov 30, 2026. 25 spots in this batch.FILL25
Fill the Server, annual: about 29.63% off your first annual invoice. Ends Nov 30, 2026.FILL25Y
Fill the Server, 2 year term: about 15.69% off your first biennial invoice. Ends Nov 30, 2026.FILL25B
Fill the Server, 3 year term: about 11.11% off your first triennial invoice. Ends Nov 30, 2026.FILL25T
80% off your first 3 months, monthly billing. Ends Dec 25, 2027.3MONTHS80
50% off your first annual Shared term. Ends Dec 31, 2027.50SHARED
Shared Starter, 3 year term: C$105.84 total.MOOSE294
20% off your first 3 monthly VPS invoices. Ends Dec 31, 2027.20VPS3
25% off your first annual base VPS term.25VPS

← All guides

Backups

Server backup Canada: how to plan an off-server copy

Published August 2026 · 8 min read

A server backup should survive the server it protects. Keeping an independent copy on Canadian infrastructure can support location requirements, but recovery quality still depends on what is copied, how consistently it is captured, and whether the data can be restored somewhere else.

Start with recovery objectives

Identify which applications matter, how much data loss is tolerable, and how long a rebuild can take. Those answers determine backup frequency, retention, transfer method, automation, and whether image-level copies alone are enough.

Make changing data application-consistent

Databases and other stateful services can be inconsistent if files are copied while writes continue. Use database-aware dumps, snapshots with the appropriate application coordination, or another method that produces a known recoverable state.

Separate backup credentials and storage from production

Use a dedicated destination identity with the smallest required permissions. Protect deletion and administration paths so compromise of the production server does not automatically grant unlimited control over every historical backup.

Test rebuilding onto a different machine

A good restore exercise proves more than file download. Recreate the operating environment, recover configuration and secrets through the approved process, restore application data, and verify the service from a clean destination.

Next step

Plan server backups in Canada around recovery goals, application-consistent data, encryption, off-server storage, retention, bandwidth, access controls, and restore testing.

See Canadian backup storage

Keep reading

Related guides.

Backup capacity planning: estimate storage from change rate and retention

Model source size, daily change, compression, deduplication, retention and growth so backup storage is sized from the workload instead of one full-copy estimate.

Read the guide

Backup encryption basics: protect copies at rest and in transit

Choose where backup data is encrypted, how keys are stored and recovered, and how restore operators gain access without putting the only key beside the backup.

Read the guide

Backup recovery drills: prove the restore process before an outage

Run isolated recovery tests, measure restore time, verify application state and record missing dependencies so the backup plan is based on tested recovery.

Read the guide

More backups guides

We will handle the move. You check it first.

Your current site stays online until your new one is ready. You approve the copy first, and if anything is not right we switch you back right away. The price you pick is the price you renew at.

Start my free moveSee plans and prices
See pricesFree move